BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//jEvents 2.0 for Joomla//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VEVENT
UID:832899bf3fb40e3fc38801a3207aa263
CATEGORIES:Overnight Trip
CREATED:20191227T035306
SUMMARY:Mt Fell Hut renovation
URL;VALUE=URI:https://live.nelsontrampingclub.org.nz/events/events-search-results/439/mt-
 fell-hut-renovation?tmpl=component
DESCRIPTION:FIVE keen persons to chopper in Saturday morning (possibly late Friday) and
  walk out to Timms Creek late Sunday. Transport provided and stay in hut.\n
 Stage 3 of hut relocation/renovation: Install fireplace and roof tie-downs;
  build mini-deck plus steps. This will bring the hut to a good secure stand
 ard for reopening for public use.\nApologies for clash with other club trip
 s but this project must progress and Xmas is coming fast.\nFirst in, first 
 served - contact Lawrie or Pat (539 1340) asap.\nStage 4 and possibly Stage
  5 in 2017 will see the project completed with construction of a wood shed,
  installation of a larger water tank and new benches, remove lead-heads and
  refasten roof, and finally a quick slap of paint inside / outside.\n \n Th
 is event was imported from: https://live.nelsontrampingclub.org.nz/events/e
 vents-search-results/439/mt-fell-hut-renovation?tmpl=component (https://liv
 e.nelsontrampingclub.org.nz/events/events-search-results/439/mt-fell-hut-re
 novation?tmpl=component)
X-ALT-DESC;FMTTYPE=text/html:<p>FIVE keen persons to chopper in Saturday morning (possibly late Friday) 
 and walk out to Timms Creek late Sunday. Transport provided and stay in hut
 .</p><p>Stage 3 of hut relocation/renovation: Install fireplace and roof ti
 e-downs; build mini-deck plus steps. This will bring the hut to a good secu
 re standard for reopening for public use.</p><p>Apologies for clash with ot
 her club trips but this project must progress and Xmas is coming fast.</p><
 p>First in, first served - contact Lawrie or Pat (539 1340) asap.</p><p>Sta
 ge 4 and possibly Stage 5 in 2017 will see the project completed with const
 ruction of a wood shed, installation of a larger water tank and new benches
 , remove lead-heads and refasten roof, and finally a quick slap of paint in
 side / outside.</p><p>&nbsp;</p> <a href="https://live.nelsontrampingclub.o
 rg.nz/events/events-search-results/439/mt-fell-hut-renovation?tmpl=componen
 t">This event was imported from: https://live.nelsontrampingclub.org.nz/eve
 nts/events-search-results/439/mt-fell-hut-renovation?tmpl=component</a>DTSTAMP:20260818T062539
DTSTART;VALUE=DATE:20161210
DTEND;VALUE=DATE:20161211
SEQUENCE:0
TRANSP:OPAQUE
END:VEVENT
END:VCALENDAR